Your time and savings estimate
A practical starting point for the conversation about your dispensary.
YOUR TIME. YOUR NUMBERS.
What could a smoother
workday be worth?
Less time chasing paperwork means more capacity for your team. Build an estimate from the work you do today.
Make it your estimate.
Monthly figures · editable example assumptions
ILLUSTRATIVE ESTIMATE / PER MONTH
Room to do more.
Estimated labor value, less the added software cost you entered.
5.25 hoursof estimated monthly team capacity recovered
- Current task time
- 21 h
- Projected task time
- 15.75 h
- Current labor cost
- $672.00
- Projected labor cost
- $504.00
- Labor value recovered
- $168.00
- Added software cost
- $0.00
- Projected total cost
- $504.00
An estimate, not a promise. Recovered time is team capacity, not guaranteed payroll savings. No avoided fines, guaranteed compliance or customer results are included.
Connect your dispensarySee the formula and assumptions
Current hours = (deliveries × minutes per delivery + separate reviews × minutes per review) ÷ 60.
Recovered hours = current hours × assumed reduction ÷ 100. Projected hours = current hours − recovered hours.
Net monthly estimate = recovered hours × loaded hourly labor cost − added monthly software cost. Projected total = projected labor cost + added software cost.
All volumes are monthly. Count each task once; do not include receiving work again in inventory review. Existing software costs are excluded from both sides. Only the added cost is deducted. Training, setup costs, taxes on software, overtime and changes in staffing are excluded. Defaults are an editable example, not observed performance.
Volumes accept whole counts from 0–100,000; task times 0–1,440 minutes; hourly cost $0–$10,000; assumed reduction 0–100%; added software cost $0–$10,000,000.